Copy the original fire performance requirement
Obtain the exact clause from the project. Record the location affected, who issued the requirement and any stated classification, method edition or mounting condition. Ask the project reviewer to clarify an incomplete clause.
Identify the exact construction under review
List the proposed face, backing, thickness, edge and any print or bonded layers. Include how and where it will be positioned. Tie the details to the supplier’s item and revision.
Compare the report to the project clause and item
Check the tested build, substrate, mounting and classification against the project clause. If a report describes a bonded assembly and the proposed use is a loose mat with another backing, list the mounting and backing as two open differences. Ask the project reviewer which evidence would resolve each one.
Record who accepts the submitted evidence
Submit the clause, item description and supporting report together. Have the responsible project party record the decision and any limitations. If the supplied construction changes, return the affected checks to that reviewer.
Project fire clause to sample construction matrix
| Requirement field | Record from the project | Match in product evidence |
|---|---|---|
| Classification and method | Exact clause, edition and required result | Report reference, stated method and classification |
| Use and mounting | Location, fixing and substrate requirements | Test mounting and substrate description |
| Construction match and decision | Offered build, changes and deciding party | Tested face, backing, thickness, edge and limitations |
Sources and further reading
Questions buyers ask
Does PVC automatically mean fire rated?
No. A relevant claim needs evidence for the actual product.
Can a report for a different backing be reused?
Do not assume coverage; check the report scope and responsible assessment.