Match the tested sample to the item offered
Read the report’s sample code, description, date, and listed face, backing and edge configuration. Compare those entries with the specification attached to the quote and record any unconfirmed match.
Read which kind of contact the method measures
Find the test method, edition, tested surface and adjacent floor or test substrate where identified. Record if the method looks at a shoe or slider on the face, or at whole-mat movement against a floor. These questions need their own applicable evidence.
Compare the dry and wet conditions
Copy the test medium, sample preparation, reported result and result scale as stated. For example, a report for a water-wet top surface still leaves detergent on the underside and whole-mat movement as separate questions. Ask the reviewer to match those questions to relevant tests and site observations.
Document the scope decision with the project reviewer
Link the report and result to the relevant project requirement and ask the responsible reviewer to decide whether the scope applies. Record outstanding items, such as a different backing, floor finish or tested medium.
Slip performance report review template
| Report field | Copy or identify | Compare to the project |
|---|---|---|
| Identification | Report and date, sample ID, face, backing and edge | Exact proposed product and specification revision |
| Method and contact | Method edition, test surface and supporting substrate | Face-to-foot or backing-to-floor question |
| Condition and result | Dry or wet, medium, result and its scale, scope | Project condition, open items and reviewer |
Sources and further reading
Questions buyers ask
Can one rating cover wet and dry use automatically?
No. Only the documented scope can support the claim.
What should I check behind an anti-slip badge?
Request the supporting report and match its product, tested surface, method and conditions to the proposed item and use.
Related steps
Review your mat placement
Send the measurements, site conditions and any evidence your project requires.