Capture what happened from packing to placement
Log whether the unit was received rolled, flat or folded, along with batch, carton, unboxing date and elapsed time before the curl was noticed. Photograph packaging pressure or damage where visible.
Measure where the edge has lifted
Mark the edge, corner or join and measure lift relative to the local floor. Take a floor-level photo with a ruler and record the time. Repeat from the same point if the site allows observation to continue.
Use the supplier’s permitted handling method
Ask for item-specific opening, handling and lay-flat guidance and confirm it covers the printed surface, backing and edge if applicable. Record any instructed conditioning before a subsequent observation.
Let the site owner decide disposition
Share the measured lift, traffic exposure and batch reference with the site owner and supplier. Record whether the unit is held, returned or observed again, and how staff will follow the agreed decision.
Curl location, height and timing log
| Record point | Measurement or observation | Trace to |
|---|---|---|
| Unboxing | Packing form, visible pressure and time opened | Batch, carton and photo |
| Raised edge | Side or corner, vertical lift, unit and measurement time | Scale photo and local floor reference |
| Later observation | Same point and any allowed handling | Responsible party and agreed disposition |
Questions buyers ask
Can a heat gun be a universal fix?
No. Do not prescribe unverified heating methods for an unknown construction.
What should photos include?
Show the edge, flat reference, scale and whole placement.
Related steps
Review your mat placement
Send the measurements, site conditions and any evidence your project requires.
