Door clearance worksheet
Measure the smallest clearance over the door’s actual sweep and the highest point of the proposed mat, including raised edges.
Calculation result
Enter the smallest gap and highest finished point
Measure the full door-sweep area that intersects the mat. Enter the smallest gap there and the highest point under that path, including the edge or raised texture. Enter both in millimetres and record the source, position and measurement date.
Use the allowance determined for the project
Enter the project allowance and note its basis. If no allowance has been determined, a zero input shows the geometric result before any additional allowance. Keep this distinction with the result record.
Read the result as a geometry check
Subtract the maximum mat height and the project allowance from the minimum door gap. In the example, 11 mm − 8 mm − 2 mm leaves 1 mm. A negative value flags a conflict between the entered dimensions, zero leaves no additional room and a positive value is the remaining geometric allowance. If the door low point and the highest mat feature are at different positions, check the corresponding dimensions at each point with the site reviewer.
Check actual opening and closing around the sample
Install the representative sample for the check and observe the door in its normal positions. The calculation covers the measured height inputs. Have the responsible site reviewer address door behaviour, transitions and any applicable approval requirements.
Net clearance formula and input record
| Input or output | Illustrative value | Keep with the result |
|---|---|---|
| Minimum gap (H) | 11 mm | Door angle, low point and measurement date |
| Maximum mat height (T) | 8 mm | Sample ID and highest edge or texture point |
| Project allowance (a) | 2 mm for this example | Project allowance and its basis |
| Net clearance (R = H − T − a) | 1 mm | Geometry result and actual door check |
Questions buyers ask
Does the calculator select a legal threshold?
No. Applicable requirements must be provided and assessed by the responsible project team.
What if I’m missing a measurement?
Measure the minimum gap and maximum mat height, record the point and date, and enter the project allowance before calculating.
Related steps
Review your mat placement
Send the measurements, site conditions and any evidence your project requires.