Program cost worksheet
Use the same currency and compare quantities, finished sizes, delivery terms, construction and evidence before using the figures.
Calculation result
Set the same commercial basis for each option
Record quantity, finished dimensions, construction, delivery terms and currency for each quote. Make differences in scope visible before comparing amounts. Use a documented conversion basis if you need to convert quotes before entry.
Keep per-unit and one-time charges separate
Enter the unit price, then list setup, packing, freight and other charges as confirmed. A standard project total is quantity × unit price plus those separate charges. Divide the total by quantity to find the allocated cost per mat.
Keep unknown or included charges identifiable
Mark charges as included, explicitly zero, confirmed amount or unknown. Keep packing and freight out of the separate subtotal when the quote says they are included in the unit price. Request actual shipment figures if freight is still unknown.
Compare scope and costs side by side
An example of 200 mats at USD 8 plus USD 120 setup, USD 100 packing and USD 300 freight totals USD 2,120 at USD 10.60 per mat if other costs are confirmed zero. Compare open items, evidence and construction alongside the figures.
Cost comparison output and currency check
| Output field | Example or check | What must agree |
|---|---|---|
| Currency and scope | USD, 200 mats, same delivery baseline | Check currency and document differences in structure or delivery |
| Project total and allocated cost | USD 2,120 total, USD 10.60 per mat | Use confirmed charges and avoid duplicate inclusions |
| Open items | Record any charge still unknown | Confirm with the supplier and keep pending charges visible |
Questions buyers ask
Can different mat constructions be ranked only by price?
No. Keep construction and acceptance differences visible.
Does the tool estimate freight automatically?
No. Enter verified quotes and their applicable basis.
Related steps
Review your mat placement
Send the measurements, site conditions and any evidence your project requires.